Electrical Panel & Service Upgrades

CurrentMax Electric delivers residential electrical panel upgrades, heavy-ups, and subpanel installations throughout Wake County and beyond. Our licensed and insured electricians modernize outdated 100-amp panels to 200-amp or 400-amp systems right at your home, ensuring your electrical infrastructure safely supports EV chargers, heat pumps, modern appliances, and whole-home surge protection.

Service Capabilities & Equipment

Whether you are expanding your home’s electrical capacity for high-draw appliances or replacing obsolete, hazardous equipment, we install industry-standard hardware engineered for safety and reliability:

  • Service Amperage Heavy-Ups: Upgrades from legacy 60A/100A services to standard 200A or high-demand 400A (320A continuous) split-meter configurations.

  • Premium Breaker Panels & Enclosures: Installation of Square D (QO & Homeline), Siemens, Eaton (Cutler-Hammer CH & BR), and Leviton Smart Panels.

  • Smart Panel & Energy Management Systems: Turnkey deployment of smart electrical panels and DCC (Demand Charge Controller / Energy Management) boxes for load-shedding without requiring full utility transformer upgrades.

  • Subpanel Additions: Dedicated 60A to 125A subpanels for detached garages, workshops, finished basements, and backyard suites.

  • Whole-Home Surge Protective Devices (SPDs): Type 1 and Type 2 surge protectors installed directly at the main disconnect to protect sensitive electronics, HVAC controllers, and smart systems.

  • Safety & Grounding System Retrofits: Upgrades to intersystem bonding termination, dual copper grounding electrode systems (driven 8-foot ground rods spaced 6 feet apart), and water pipe/gas line bonding.

  • Breaker Replacements & Modernization: Replacement of obsolete or discontinued panels with modern AFCI/GFCI dual-function breakers.

Local Permitting & NEC Code Compliance

Electrical heavy-ups involve both your local building department and your electric utility provider. We coordinate the entire process to ensure compliance with the National Electrical Code (NEC):

Transparent Cost Factors: What Shapes Your Estimate

Every home’s electrical layout is unique. When we provide a transparent, upfront estimate for your panel upgrade, here are the key variables that influence total project cost:

  • Target Amperage Capacity: Upgrading from 100A to 200A is a straightforward swap for most homes. Expanding to a high-capacity 400A service requires dual-panel configurations, a larger commercial-grade meter base, and heavier service-entrance wire.

  • Overhead vs. Underground Utility Entry: Overhead service drops with clear roof clearance are faster and less labor-intensive. Underground service lines (laterals) require careful coordination and can increase costs if trenching through concrete walkways, driveways, or mature landscaping is required.

  • Meter-to-Panel Distance: Installations where the main panel sits directly opposite the outdoor meter socket ("back-to-back") require minimal wiring. Extended runs through finished basements, attics, or crawlspaces require more conduit and heavy-gauge copper conductor.

  • Grounding & Bonding Modernization: Homes with outdated grounding systems will need new 8-foot dual copper ground rods driven outside, along with code-compliant bonding retrofits to interior cold-water lines and gas piping.

  • Branch Circuit Wiring & Slack: If your home's existing wire leads inside the panel wall cavity have plenty of slack, transferring them to new breakers is straightforward. Shortened, brittle, or cut wires require individual junction boxes, wire pigtails, or minor re-routing.

  • Permitting & Utility Fees: Municipal permit fees and utility disconnect/reconnect charges vary based on your local jurisdiction and power utility provider. We handle all paperwork and outline these fees upfront in your quote.

Step-by-Step Installation Process

01

Site Assessment & Load Calculation

Pre-install technical review

We inspect your current panel, meter socket, and grounding path. We then calculate your home’s existing and projected electrical demand under NEC Article 220 to determine the exact panel sizing (200A vs. 400A) and identify utility coordination needs.

02

Permit Acquisition & Utility Coordination

Handling all regulatory paperwork

CurrentMax Electric submits detailed engineering plans and pulls required municipal permits. We coordinate scheduled service disconnects and reconnects directly with your electric utility company.

03

Installation & System Modernization

1-day scheduled power shutdown

Our technicians remove the obsolete enclosure, mount the new meter base and panelboard, install new main service-entrance conductors, wire dual-function AFCI/GFCI breakers, connect the whole-home surge protector, and establish all grounding electrode bonds. Power is typically restored by late afternoon.

04

Code Inspection, Testing & Final Sign-Off

Final sign-off and safety audit

We perform complete voltage drop and polarity testing across all circuits. The municipal inspector inspects the job site for final permit sign-off, after which the utility provider applies their security seal to the new meter enclosure.

Frequently Asked Questions